ISTANBUL (AA) – Ready-made construction sector brand Karmod, made the installation of prefabricated buildings in Cuba.
According to a statement from Karmod, construction sites completed in Trinidad, Cuba will be used during the construction of the five-star hotel project of the country’s international tourism group, Iberostar.
In his statement, Karmod Sales Coordinator Vusal Necmettin stated that they have delivered the important project of a total of 20 square meters in which a prefabricated, hangar, container and cabin products are preferred together in a short period of time of 27 days.
Under the project, they perform pre-production office in Turkey, technical offices, a cafeteria, a dormitory structures, such as stating that they are ready to make installation in place by Necmettin Karmod team said:
“Prefabricated, hangar, container and cabin, all of our building models are preferred together in this project at the same time the construction authorities of the country is the first prefabricated building project in Cuba was a surprise to us. We are proud to be the first brand of the sector to realize projects in this country.
All materials used in our buildings, our country sent from Turkey to the small screws are trying to provide maximum contribution to the economy. For the construction site of the hotel project, we have installed three 215×270 cm security cabins, together with two prefabricated buildings, one of which is 250 and the other of 200 square meters, three steel hangar buildings of 114 square meters each, and a new generation container building consisting of 15 demountable units with a total size of 210 square meters
BY ANADOLE AGENCY